Split plan · hollow concrete block · hipped tiled roof · garage
3 bedrooms + garage
| Room | Zone | Clear size (m) | Area m² |
|---|---|---|---|
| Gross floor area (outside of walls) | 182.4 | ||
| A-001 | Roof plan (hipped), drawing list, specification |
| A-101 | Ground floor plan 1:100 |
| A-102 | Reflected ceiling plan — ceiling types, lights, fans, speakers, APs, hatches |
| A-201 / A-301 | Elevations and sections 1:100 |
| A-601 / A-602 | Door, window and room schedules; finishes plan and schedule |
| A-603 | Paint and colour schedule — interior colour plan, RAL colours, paint systems |
| A-604 | Carpentry and joinery — kitchen, vanities, cupboards, door elevations |
| S-101, S-501–503 | Foundation plan and connection details 1–9 |
| P-101 | Plumbing — sewer and stormwater, drain schedule with inverts |
| P-102 | Plumbing — fresh water, hot and cold, 2 geysers |
| P-103 | Plumbing — fire water: hose reel, extinguishers, alarms, hose reach |
| M-101 | HVAC — 4 split AC units, refrigerant routes, extract fans, hood |
| E-101 | Electrical — power: sockets, isolators, main DB circuits |
| E-102 | Electrical — lighting: luminaires, switching, circuits |
| E-103 | UPS — 5 kVA inverter, 10.2 kWh battery, essential board and load |
| E-104 | CCTV and intercom — 9 cameras with views, NVR, cabling |
| E-105 | Audio visual and data — TV, data, speakers, Wi-Fi, 9U cabinet |
Preliminary — for review. Drainage, water, electrical and the sewer connection are indicative until the site survey and authority requirements are confirmed. The main suite sits in its own west wing, away from the other bedroom wing. Confirm founding conditions, wind loading, truss design (by the truss supplier) and member sizes against SANS 10400 and SANS 10160 before construction.